StoneTerra Case Studies

arlington project

Arlington 360

The redevelopment, Arlington 360, for the former Symmes Hospital and its 19-acre hilltop campus includes constructing 200 residential units and two parks. Construction commenced in April, 2012 and will continue for approximately 24-36 months. The Town of Arlington is pleased to see construction underway as the project has been planned for a while, but stalled due to economic conditions.....Case Study PDF

west side hospital project

Kaiser Permanente

A new Kaiser Permanente facility is in construction in Hillsboro, OR. Trying to stick to the Kaiser facility layout seen throughout California, the architects, engineers and general contractor realized they would need to get creative for this 15-acre construction site. Due to the climatic and weather differences varying from California to Oregon, they knew they would need to alter the original plans for the Westside Medical Center.....Case Study PDF

broadway apartment project

Broad Vantage Apartments

The former I-84 off-ramp on 82nd Ave in Portland, OR was used to creative an attractive, mixed-use housing development. Innovative Housing, Inc (IHI) decided the central transit-oriented location provided the perfect site for a newly constructed, housing development. However, the project was not without its obstacles.....Case Study PDF

bethel campus project

Bethel College Ampitheater

Bethel College decided to expand the campus to include a new 60-seat amphitheater outside its Dining Commons. The $11,000 project, funded through the Bethel College class of 2012 and the 50-year class of 1962, currently serves as an outdoor classroom during the warmer months as well as a small performance site.....Case Study PDF

Broad Vantage Apartment Playground

Learn More

Read and learn more about the technical aspects of the StoneTerra Retaining Wall System by visiting the StoneTerra Technical page.

Contact Us

If you'd like more information on the StoneTerra Wall System and how it can be applied to your project please email us at sales@ultrablock.com or call us toll free at (800) 377-3877.

beginning construction retaining wall during construction retaining wall after construction retaining wall stoneterra retaining wall